I started my new job at Hemlock Semiconductor yesterday. I am an instrumentation engineer out there. So far the job has kept me busy meeting new people, online training, and trying to figure out just what my job entails. So far everyone has been very friendly and very helpful. I will be incredibly busy at work once I get up to speed, but I am looking forward to it.
The staining and varnishing of the trim is DONE! I have some door frames to varnish...and I still have to stain the doors themselves...but the trim is done! That is a nice thing to have out of the way.
With the trim being done I could start concentrating on my tile floors. Dad helped me pick out some accent tiles for my floors this weekend. I did some playing with layouts and found some great looks...with some good artistic direction from Dad. :) This is the half bath tile lay out.
This is the main bathroom layout. It matches very well with the border in the shower with the color and angle of the tiles.
This is the master bath floor with some larger accent tiles. I think I'm going to put some of these tiles throughout my shower also to tie it in with the floor.
Dad and I were out laying tile in the laundry room tonight. It is probably half done. I will go out to finish it tomorrow.
The hardwood floors were finished last week. However, when I look into my study you can see the sanding grooves on the floor. The same thing happens in the front entry. So the hardwood installer will have to come back to sand the floors again, re-stain and re-finish them. I now see why Dad's motto has always been "Do it right the first time". :)
I have some more cabinets installed also. These are the cabinets for my vanity in the master bath.